新聞
Water in Abundance
發佈於 · 2015年7月15日
← 返回新聞列表

In our Abagold newsletter of 1 December, we reported on the pipeline project which was commissioned on 6 October 2009. In order to pump more water to Bergsig farm and save electricity at the same time, a new 700mm pipeline of 450 metres in length was required. This new pipe was routed from the Sea View pumphouse, across the farm and all the way around the perimeter of Bergsig. Read More