Newsletter – 1 December 2009
Water in Abundance! In order to pump more water to Bergsig farm and save electricity at the same time, a new 700mm pipeline of ± 450 metres in length was required. This new pipe was routed from the Sea View pumphouse, across the farm and all the way around the perimeter of Bergsig.