News
Newsletter – 1 December 2009
Published · 1 December 2009
← Back to News
Water in Abundance! In order to pump more water to Bergsig farm and save electricity at the same time, a new 700mm pipeline of ± 450 metres in length was required. This new pipe was routed from the Sea View pumphouse, across the farm and all the way around the perimeter of Bergsig.